Projects

Algoa Cement
Commercial Case Study

Size of install
55kW of solar panels and two 25kw SolarEdge inverters

Client requirement
The Eastern Cape factory Algoa Cement installed a 55kW solar PV system to reduce electricity costs and carbon emissions.

Result
This solar array now provides approximately 48% of Algoa’s electricity needs, allowing them to lock in pricing for the majority of their energy load and hedge against rising prices.

The Eastern Cape factory Algoa Cement installed a 55kW solar PV system to reduce electricity costs and carbon emissions. The grid-tied system features 55kW of solar panels and two SolarEdge inverters, estimated to generate 61MWh annually. This solar array now provides approximately 60% of Algoa’s electricity needs, allowing them to lock in pricing for the majority of their energy load and hedge against rising prices. By generating renewable solar electricity on-site, Algoa Cement has significantly decreased their carbon footprint, avoiding over 1,500 tonnes of CO2 emissions over 25 years. The system was financed so savings on electricity costs could pay off the capital expenditure over three years, allowing Algoa to realize immediate financial benefits from the solar installation. This case study shows how an industrial facility like Algoa Cement can utilize solar PV to achieve environmental sustainability, energy savings, and price stability. With innovative solutions like this, manufacturers can cost-effectively transition to clean, renewable energy while reducing operating expenses.

Luddite
Commercial PV

Size of install
50kw

Client requirement
30kw Solar panels and 40kwh batteries. To cover farm operations over power outages which may extend longer than loadshedding and decrease electricity bills dramatically.

Result
With this size of installation, they were able to decrease their load by 100% during the day with the aim to reduce their total bill by 70%. They have also shrunk their carbon footprint significantly.

Beaumont
Commercial PV

Size of install
100kw

Client requirement
100kw Inverter, 30kw Solar panels and 120kwh batteries. To cover farm operations over power outages which may extend longer than loadshedding and eradicate generator usage and decrease electricity bill dramatically.

Result
With this size of installation they were able to decrease their load by 70% during the day. They have also shrunk their carbon footprint significantly.

Soeterus
Commercial PV

Size of install
36kw

Client requirement
Cover all their daytime electric usage so as to bring down the electricity bill substantially

Result
The client has seen a reduction of 98% in daytime electricity usage, the equivalent of 55 trees planted and a saving of 16397 Co2 emissions.

Ok Express
Commercial PV

Size of install
60kw

Client requirement
Cover all their daytime electricity usage so as to bring down the electricity bill substantially

Somerset Lakes
Solar System and Heat pump

Size of install
142 Solar Waterheating systems
27 heat pumps

Client requirement
Installation of efficient water heating systems throughout the estate

Result
So far we have successfully installed 170 heat pump and solar systems within the estate with more to come as the estate expands

Koelenbosch
Heat Pumps

Size of install
60 x 200L geyser and heat pumps

Client requirement
Efficient water heating system for each individual house

Result
We have currently installed 30 x 200L geysers with 3kw heat pumps for each house in the estate. The remaining installations will be completed as and when the houses are built.

Nooitgedacht
Solar Systems and Heat Pumps

Size of install
300 x geysers and heat pumps or solar systems

Client requirement
Installation of efficient water heating systems throughout the estate

Result
We have currently installed over 250 geysers with either heat pumps or solar water heating system for each house in the estate. The remaining installations will be completed as and when the houses are built.

Val de Vie
Solar Systems

Size of install
Over 300 domestic house with either heat pumps or solar water heating being installed

Client requirement
Installation of efficient water heating systems throughout the estate

Result
We work with a number of the main building contractors at Val de Vie to install their efficient water heating systems (heat pumps or solar water heating systems) for each of the individual houses that they build.

Quivertree
Case Study

Size of install
4 x 25kw heat pumps and
10 x 1000L German hot water storage tanks

Client requirement
Removal of 104 x 150L geysers each containing a 3kw electrical element and replace it with a centralised hot water system comprising of 10 x 1000L German hot water storage tanks and 4 x 25kw ITS heat pumps as well as an efficient hot water ring main.

Result
Fantastic installation that has reduced their daily electricity consumption for hot water from 900kwh to 200kwh per day. The return on investment for this client was 1.5 years.

Oro Agri
Case Study

Size of install

1 x 27.6kW SolarEdge three-phase inverter, 30kW solar panels, Grid-tied system

Client requirement
The main goal of the project was to reduce Oro Agri’s electricity demand and costs during daytime operation.

Result
The 30kW solar array provides approximately 30% of Oro Agri’s electricity consumption during daytime operation. Over the system’s estimated 25 year life, over 500 tonnes of CO2 emissions will be avoided.

System Details:

  • 1 x 27.6kW SolarEdge three-phase inverter
  • 30kW solar panels
  • Grid-tied system

Project Goals: The main goal of the project was to reduce Oro Agri’s electricity demand and costs during daytime operation. A secondary goal was shrinking their carbon footprint through clean solar energy generation.

Results: The 30kW solar array provides approximately 30% of Oro Agri’s electricity consumption during daytime operation. By feeding solar energy directly into the building, the grid-tied system effectively reduces the facility’s electricity draw from the utility.

By meeting 30% of their daytime energy needs with solar, Oro Agri has significantly decreased its carbon emissions. Over the system’s estimated 25 year life, over 500 tonnes of CO2 emissions will be avoided.

The system also provides a hedge against rising electricity prices. Solar energy is free once the system is paid off, providing Oro Agri with long-term energy price stability.

Domestic off Grid

Size of install
10kw panels and 30kw battery back up

Client requirement
To become independent of the grid during the summer months

Result
Since November 2019 they have had compete independence from the Grid and no load shedding interruptions.

Algoa Cement
Commercial Case Study

Size of install
55kW of solar panels and two 25kw SolarEdge inverters

Client requirement
The Eastern Cape factory Algoa Cement installed a 55kW solar PV system to reduce electricity costs and carbon emissions.

Result
This solar array now provides approximately 48% of Algoa’s electricity needs, allowing them to lock in pricing for the majority of their energy load and hedge against rising prices.

The Eastern Cape factory Algoa Cement installed a 55kW solar PV system to reduce electricity costs and carbon emissions. The grid-tied system features 55kW of solar panels and two SolarEdge inverters, estimated to generate 61MWh annually. This solar array now provides approximately 60% of Algoa’s electricity needs, allowing them to lock in pricing for the majority of their energy load and hedge against rising prices. By generating renewable solar electricity on-site, Algoa Cement has significantly decreased their carbon footprint, avoiding over 1,500 tonnes of CO2 emissions over 25 years. The system was financed so savings on electricity costs could pay off the capital expenditure over three years, allowing Algoa to realize immediate financial benefits from the solar installation. This case study shows how an industrial facility like Algoa Cement can utilize solar PV to achieve environmental sustainability, energy savings, and price stability. With innovative solutions like this, manufacturers can cost-effectively transition to clean, renewable energy while reducing operating expenses.

Luddite
Commercial PV

Size of install
50kw

Client requirement
30kw Solar panels and 40kwh batteries. To cover farm operations over power outages which may extend longer than loadshedding and decrease electricity bills dramatically.

Result
With this size of installation, they were able to decrease their load by 100% during the day with the aim to reduce their total bill by 70%. They have also shrunk their carbon footprint significantly.

Beaumont
Commercial PV

Size of install
100kw

Client requirement
100kw Inverter, 30kw Solar panels and 120kwh batteries. To cover farm operations over power outages which may extend longer than loadshedding and eradicate generator usage and decrease electricity bill dramatically.

Result
With this size of installation they were able to decrease their load by 70% during the day. They have also shrunk their carbon footprint significantly.

Soeterus
Commercial PV

Size of install
36kw

Client requirement
Cover all their daytime electric usage so as to bring down the electricity bill substantially

Result
The client has seen a reduction of 98% in daytime electricity usage, the equivalent of 55 trees planted and a saving of 16397 Co2 emissions.

Ok Express
Commercial PV

Size of install
60kw

Client requirement
Cover all their daytime electricity usage so as to bring down the electricity bill substantially

Somerset Lakes
Solar System and Heat pump

Size of install
142 Solar Waterheating systems
27 heat pumps

Client requirement
So far we have successfully installed 170 heat pump and solar systems within the estate with more to come as the estate expands

Result
The client has seen a reduction of 98% in daytime electricity usage, the equivalent of 55 trees planted and a saving of 16397 Co2 emissions.

Koelenbosch
Heat Pumps

Size of install
60 x 200L geyser and heat pumps

Client requirement
Efficient water heating system for each individual house

Result
We have currently installed 30 x 200L geysers with 3kw heat pumps for each house in the estate. The remaining installations will be completed as and when the houses are built.

Nooitgedacht
Solar Systems and Heat Pumps

Size of install
300 x geysers and heat pumps or solar systems

Client requirement
Installation of efficient water heating systems throughout the estate

Result
We have currently installed over 250 geysers with either heat pumps or solar water heating system for each house in the estate. The remaining installations will be completed as and when the houses are built.

Val de Vie
Solar Systems

Size of install
Over 300 domestic house with either heat pumps or solar water heating being installed

Client requirement
Installation of efficient water heating systems throughout the estate

Result
We work with a number of the main building contractors at Val de Vie to install their efficient water heating systems (heat pumps or solar water heating systems) for each of the individual houses that they build.

Quivertree
Case study

Size of install
4 x 25kw heat pumps and 10 x 1000L German hot water storage tanks

Client requirement
Removal of 104 x 150L geysers each containing a 3kw electrical element and replace it with a centralised hot water system comprising of 10 x 1000L German hot water storage tanks and 4 x 25kw ITS heat pumps as well as an efficient hot water ring main.

Result
Fantastic installation that has reduced their daily electricity consumption for hot water from 900kwh to 200kwh per day. The return on investment for this client was 1.5 years.

Oro Agri
Case Study

Size of install

1 x 27.6kW SolarEdge three-phase inverter, 30kW solar panels, Grid-tied system

Client requirement
The main goal of the project was to reduce Oro Agri’s electricity demand and costs during daytime operation.

Result
The 30kW solar array provides approximately 30% of Oro Agri’s electricity consumption during daytime operation. Over the system’s estimated 25 year life, over 500 tonnes of CO2 emissions will be avoided.

System Details:

1 x 27.6kW SolarEdge three-phase inverter
30kW solar panels
Grid-tied system

Project Goals:
The main goal of the project was to reduce Oro Agri’s electricity demand and costs during daytime operation. A secondary goal was shrinking their carbon footprint through clean solar energy generation.

Results:
The 30kW solar array provides approximately 30% of Oro Agri’s electricity consumption during daytime operation. By feeding solar energy directly into the building, the grid-tied system effectively reduces the facility’s electricity draw from the utility.

By meeting 30% of their daytime energy needs with solar, Oro Agri has significantly decreased its carbon emissions. Over the system’s estimated 25 year life, over 500 tonnes of CO2 emissions will be avoided.

The system also provides a hedge against rising electricity prices. Solar energy is free once the system is paid off, providing Oro Agri with long-term energy price stability.

Domestic off Grid

Size of install
10kw panels and 30kw battery back up

Client requirement
To become independent of the grid during the summer months

Result
Since November 2019 they have had compete independence from the Grid and no load shedding interruptions.